精品视频一区二区三区-亚洲色图一区二区-在线不欧美-欧美性精品-国产视频导航-很黄很污的网站-成人性生生活性生交3-高h大肚孕期孕妇play-巨乳波霸影院-午夜爽爽影院-97超碰成人-成人黄色一级视频-中出在线播放-日韩videos-九一亚色

Media
Shen shun gao attended the meeting of the standard unit in the maintenance base of nanhang Beijing new airport
Source:不詳????Update:2017/4/24 14:39:18????FontSize:【L??M??S


001.jpg

On April 21, the company's general manager, shen shun gao, attended the meeting of the bid center of the construction headquarters of the new airport in Beijing. During the meeting, the headquarters for the chief engineer dong-ming zheng this paper expounds in detail the design technical requirements, secretary of the commission for discipline inspection seal chi-wai do to honest work focus, the commander wang do summary statement to the overall requirement of the project, asking the design unit attaches great importance to the political thought, into a good soldier character, efforts will build the new airport project into a practical project southern Beijing benchmarking project. The meeting was presided over by lu junhong, the party secretary of the headquarters.


Shen Shun high on behalf of the company to receive the letter of acceptance in the project, his first thanked China southern to the company's long-term support trust, stressed that will set the whole company strengths to ensure the smooth implementation of the new airport project, China southern Beijing with high sense of responsibility will become a high-quality goods China southern Beijing's new airport base construction engineering, template engineering, safe clean engineering, thus contributing to the construction of China southern airlines guangzhou, Beijing double hub catic should be responsibility.


China southern Beijing airport base includes five parts: maintenance maintenance, air cargo, airline catering, production operation logistics facilities, with a total construction area of 1.09 million square meters, the company to undertake maintenance efficiency of plot construction area of about 207000 square meters. The hangar span is 183m+ 222m, with a limit of 40m to satisfy two a380s three B777 aircraft in warehousing maintenance. After completion, the project will become the largest hangar in the country. The design period of this project is 90 days, the on site design is closely connected with the headquarters.